MATREX has been awarded two major BHS projects in Cameroon.
Design and manufacture of baggage handling system for the arrival area at Yaoundé airport (Cameroon). The BHS system consisted of belt conveyors (collector, sequencing, injector…) and two T-shaped baggage reclaim carousels (76m and 56m).
Development of a baggage handling system for the departure area at Garoua airport. The infrastructure included 6 baggage check-in conveyor, an odd-size check-in conveyor, free roller conveyors, belt conveyors and a remote maintenance system.
(for Garoua airport)...
News
Bodet Time, the French specialist in time management, has equipped the Syamsudin Noor International Airport in Banjarmasin, Indonesia, with its time synchronisation solutions:
Netsilon time servers: to reinforce cybersecurity and improve performance,
Style 10 LED digital clocks: to make it very easy to see the time,
Profil 740 analog clocks: to combine a timeless design with easy readability
Solutions designed for the specific needs of airports.
Discover them all here :
For more information, contact us at : ...
The SOARIZON by Thales, and Thales UK have been selected to support Regulatory Sandbox trials for drone deliveries in non-segregated airspace.
"Delivery drone service provider Skyports has announced today that it has been accepted into the UK Civil Aviation Authority’s (CAA) Regulatory Sandbox to trial beyond visual line of sight (BVLOS) flights in non-segregated airspace.
The Regulatory Sandbox is a programme established by the UK CAA to create an environment where innovation in aviation can be explored in line with UK CAA core principles of safety,...
Project characteristics
Length : 100 m
pedestrian fluid circulation between metro station, sécurity and terminal 2
The consortium of these companies
Enia architectes,
BM architecture,
1PAX, Setec international,
Setec Bâtiment,
Guez Caraïbes,
Acoustique et Conseil
has just won a competition for the extension of the international terminal of Guadeloupe airport.
What a great panorama at OrlyAirport !
Indeed Panorama Suite is the backbone of Smart Airport in Paris Orly.
8 key systems of the airport rely on Codra Panorama Platform to ensure the right process of Passenger Security Check, Building Management System of aircraft parking, monitoring and control of Airfield Lighting or Apron Lighting.
For more details, check: https://codra.net/en/
Next time you’re in Niamey go and see ALPHA-CIM who is designing and installing the new Airfield Lighting Monitoring System at the airport.
The system uses Programmable Logic Controllers from Schneider Electric and runs over an IP network on glass fibre linking all the different buildings.
For the first time in Toulouse this March: implementation of the UAV of the Directorate of Technology and Innovation (DTI) for the calibration of a PAPI as part of an experiment on the “pilot airport” of Toulouse-Francazal, a fast-growing airfield.
This demonstration, carried out by France Aviation Civile Services, in an extremely short amount of time, showed the operational and technical capabilities of the DTI in this rapidly growing and promising domain of calibration with UAV.
Thanks to our expertise, the teams from the different concerned departments were perfectly...
ACOREL - Automatic People Counting Systems is equiping EuroAirport Basel-Mulhouse-Freiburg with Automatic Passenger Counting and Queue Management Systems.
Since 2018 to now, #ACOREL has been installing 150 sensors in police, border, check-in and even the rest rooms of the #Airport in order to give the exact information (at over 98% accuracy!) about #FlowOfPassengers and #QueueingTimes.
This is perfect for managing passenger queues, providing information in real time, optimizing sales systems in duty free shops and restaurants, and also...
With the acquisition of 49% of the Indian Group GMR Airports, Group ADP creates the leading global network of airports.
Groupe ADP has signed a share purchase agreement to buy, under certain conditions, a 49% stake in GMR Airports.
The operation will unfold in two phases: a first phase will be realized within the coming days for a 24.99% stake. The second phase, for 24.01%, is subject to certain regulatory conditions, notably obtaining the customary regulatory approvals for that type of project, in particular from the Reserve Bank of India. It will be concluded during the upcoming months...